{"id":40135,"date":"2024-01-15T09:00:00","date_gmt":"2024-01-15T08:00:00","guid":{"rendered":"https:\/\/www.bimandco.com\/bim\/?p=40135"},"modified":"2024-01-10T16:35:08","modified_gmt":"2024-01-10T15:35:08","slug":"desarrollar-una-convencion-bim-completa-y-eficaz","status":"publish","type":"post","link":"https:\/\/www.bimandco.com\/bim\/es\/desarrollar-una-convencion-bim-completa-y-eficaz\/","title":{"rendered":"Desarrollar una Convenci\u00f3n BIM Completa y Eficaz"},"content":{"rendered":"\n<p>En nuestro <a href=\"https:\/\/www.bimandco.com\/bim\/es\/entender-los-fundamentos-de-la-convencion-bim-parte-1\/?utm_source=bimandco&amp;utm_medium=blog&amp;utm_campaign=convention-BIM-012024&amp;utm_content=ES\"><strong>art\u00edculo anterior<\/strong><\/a>, sentamos las bases para la Convenci\u00f3n BIM. Ahora vamos a sumergirnos aun m\u00e1s en el desarrollo de una convenci\u00f3n completa y efectiva.<\/p>\n\n\n\n<p>Este art\u00edculo se centrar\u00e1 en cuatro pilares esenciales de la Convenci\u00f3n BIM: la informaci\u00f3n requerida, la gesti\u00f3n de los derechos, el manejo de las modificaciones y la formaci\u00f3n y concienciaci\u00f3n.<\/p>\n\n\n\n<p>Para asegurar el buen funcionamiento de su Convenci\u00f3n BIM, cada aspecto debe ser integrado. Esto garantiza transparencia, protecci\u00f3n de derechos y adaptaci\u00f3n a las necesidades del proyecto. Todas las equipos deben comprenderla y ponerla en pr\u00e1ctica.<\/p>\n\n\n\n<p>El dominio de estos aspectos forja una Convenci\u00f3n BIM eficaz, gestionando la informaci\u00f3n, protegiendo los derechos y fomentando la colaboraci\u00f3n. Prep\u00e1rese para sumergirse en estos temas esenciales y dirigir su Convenci\u00f3n BIM con \u00e9xito.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Informaci\u00f3n Requerida<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Especificaciones de los Datos BIM<\/h3>\n\n\n\n<p>Es esencial especificar los tipos de datos BIM necesarios para el proyecto. Esto puede incluir:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Geometr\u00eda<\/strong>: Las dimensiones y la forma de los elementos de construcci\u00f3n.<\/li><li><strong>Costos<\/strong>: Estimaciones presupuestarias, costos de materiales, costos de mano de obra, etc.<\/li><li><strong>Calendarios<\/strong>: Cronogramas de construcci\u00f3n, plazos de tareas, fechas clave.<\/li><li><strong>Informaci\u00f3n sobre materiales<\/strong>: Especificaciones de los materiales utilizados en la construcci\u00f3n.<\/li><li><strong>Datos de rendimiento<\/strong>: Datos sobre la resistencia de los materiales, durabilidad, eficiencia energ\u00e9tica, etc.<\/li><li><strong>Mantenimiento y operaciones<\/strong>: Informaci\u00f3n sobre mantenimiento, mantenimiento preventivo, costos de ciclo de vida.<\/li><\/ul>\n\n\n\n<p>Para cada tipo de dato BIM, se debe explorar en detalle la informaci\u00f3n espec\u00edfica a incluir. Por ejemplo, para la <strong>geometr\u00eda<\/strong>, esto podr\u00eda implicar longitud, ancho, altura, forma y coordenadas espaciales. Para los costos, se tratar\u00eda de especificar costos unitarios, cantidades, costos totales, etc. Esta precisi\u00f3n garantiza que los modelos BIM sean completos y relevantes para las necesidades del proyecto.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Atributos y Propiedades<\/h3>\n\n\n\n<p>Los atributos y propiedades definen las caracter\u00edsticas espec\u00edficas de los objetos BIM. Los atributos de una viga, por ejemplo, incluyen longitud, ancho, profundidad, material, resistencia a la compresi\u00f3n y otras caracter\u00edsticas espec\u00edficas. Estos atributos enriquecen los objetos BIM con informaci\u00f3n.<\/p>\n\n\n\n<p><strong>Los atributos y propiedades<\/strong> desempe\u00f1an un papel crucial en la precisi\u00f3n y coherencia de los modelos BIM. Permiten una definici\u00f3n detallada de los objetos y facilitan la gesti\u00f3n de datos a lo largo del proyecto. Al explotar los atributos de los materiales, por ejemplo, se puede automatizar el c\u00e1lculo de las cantidades necesarias, facilitando la estimaci\u00f3n de costos.<\/p>\n\n\n\n<p><strong>Normalizar<\/strong> la definici\u00f3n de atributos y propiedades asegura una coherencia global en el proyecto, una recomendaci\u00f3n esencial. La uniformidad en las convenciones de nomenclatura y las unidades de medida asegura la coherencia, evitando errores e incompatibilidades entre los participantes.<\/p>\n\n\n\n<p>Al especificar los tipos de datos BIM necesarios y detallar los atributos y propiedades de los objetos BIM, una Convenci\u00f3n BIM asegura que todos los actores trabajen con informaci\u00f3n coherente y completa. Esto contribuye a la precisi\u00f3n de los modelos, la gesti\u00f3n efectiva de los datos y la toma de decisiones informadas a lo largo del proyecto.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Gesti\u00f3n de Derechos<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Propiedad Intelectual<\/h3>\n\n\n\n<p>La gesti\u00f3n de la <strong>propiedad intelectual de los modelos y datos BIM<\/strong> es crucial. Es esencial especificar los titulares de los derechos sobre los modelos, datos e informaci\u00f3n compartida. Esto puede variar seg\u00fan los contratos y acuerdos entre las partes interesadas, y es importante tenerlo en cuenta.<\/p>\n\n\n\n<p>Es necesario especificar c\u00f3mo los modelos y datos BIM pueden ser compartidos y utilizados. Esto puede incluir restricciones sobre la redistribuci\u00f3n, modificaci\u00f3n o reutilizaci\u00f3n de los modelos por otras partes. Adem\u00e1s, es importante especificar los derechos de uso para la fase de explotaci\u00f3n y mantenimiento del edificio.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Acceso a los Datos<\/h3>\n\n\n\n<p>Para cada parte interesada involucrada en el proyecto, es esencial definir claramente los <strong>permisos de acceso a los datos BIM<\/strong>. Esto incluye a arquitectos, ingenieros, contratistas, propietarios y otros actores. Los permisos de acceso deben especificar qu\u00e9 partes interesadas pueden acceder a qu\u00e9 datos, con qu\u00e9 fines y en qu\u00e9 condiciones.<\/p>\n\n\n\n<p>La protecci\u00f3n de los datos BIM contra la divulgaci\u00f3n no autorizada es una preocupaci\u00f3n importante. Establecer mecanismos de seguridad asegura que los datos sensibles no se divulguen a terceros no autorizados, de manera necesaria. Esto puede incluir medidas como el cifrado de datos, acceso con contrase\u00f1a, monitoreo de actividades de acceso, etc.<\/p>\n\n\n\n<p>Es importante especificar<strong> <\/strong>las<strong> responsabilidades de cada parte interesada<\/strong> con respecto a la protecci\u00f3n de los datos BIM. Esto puede incluir requisitos como la capacitaci\u00f3n del personal en pr\u00e1cticas de seguridad de datos, informar sobre incidentes de seguridad y implementar pol\u00edticas de seguridad adecuadas.<\/p>\n\n\n\n<p>La gesti\u00f3n de derechos en una Convenci\u00f3n BIM es esencial para proteger la propiedad intelectual, garantizar la seguridad de los datos y establecer reglas claras para el acceso y uso de la informaci\u00f3n. Una adecuada gesti\u00f3n de derechos fomenta la confianza entre las partes interesadas y contribuye a evitar posibles disputas relacionadas con la propiedad intelectual y la confidencialidad de los datos.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Gesti\u00f3n de Modificaciones<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Proceso de Modificaci\u00f3n<\/h3>\n\n\n\n<p>Una gesti\u00f3n clara de las modificaciones asegura el orden y la conformidad en la evoluci\u00f3n de la Convenci\u00f3n BIM. Este proceso incluye varias etapas:<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li><strong>Presentaci\u00f3n de las Modificaciones<\/strong>: Especificar qui\u00e9n puede presentar modificaciones a la convenci\u00f3n y c\u00f3mo deben ser presentadas (por ejemplo, en forma de propuesta escrita).<\/li><li><strong>Evaluaci\u00f3n de las Modificaciones<\/strong>: Definir c\u00f3mo se evaluar\u00e1n las modificaciones para determinar su pertinencia y su impacto en el proyecto BIM. Esto puede implicar una evaluaci\u00f3n t\u00e9cnica, presupuestaria, temporal, etc.<\/li><li><strong>Aprobaci\u00f3n de las Modificaciones<\/strong>: Especificar qui\u00e9n tiene la autoridad para aprobar o rechazar las modificaciones. Puede ser el jefe de proyecto, el comit\u00e9 de gesti\u00f3n del proyecto u otras partes designadas.<\/li><li><strong>Comunicaci\u00f3n de las Modificaciones<\/strong>: Indicar c\u00f3mo se comunicar\u00e1n las modificaciones aprobadas a todas las partes interesadas involucradas y c\u00f3mo se integrar\u00e1n en la Convenci\u00f3n BIM.<\/li><\/ol>\n\n\n\n<p>Es importante establecer un proceso transparente y responsable para la gesti\u00f3n de las modificaciones. Esto garantiza que todas las partes interesadas est\u00e9n informadas sobre los cambios y que las decisiones se tomen de manera justa y documentada.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Documentaci\u00f3n de Revisiones<\/h3>\n\n\n\n<p>La importancia de documentar todas las <strong>revisiones<\/strong> realizadas a la Convenci\u00f3n BIM no puede subestimarse. Cada modificaci\u00f3n, ya sea menor o mayor, debe registrarse. Esto permite llevar un registro de la evoluci\u00f3n de la convenci\u00f3n y comprender por qu\u00e9 se realizaron ciertas modificaciones.<\/p>\n\n\n\n<p>La convenci\u00f3n deber\u00eda incluir un <strong>historial de revisiones <\/strong>que enumere todas las modificaciones realizadas a lo largo del tiempo. Cada entrada deber\u00eda contener informaci\u00f3n sobre la fecha de la modificaci\u00f3n, la naturaleza de la modificaci\u00f3n, la raz\u00f3n de la modificaci\u00f3n y las partes interesadas involucradas.<\/p>\n\n\n\n<p>La documentaci\u00f3n de las revisiones hace que la <strong>Convenci\u00f3n BIM sea auditada<\/strong>. Esto significa que cualquier parte interesada puede examinar el historial de revisiones para comprender c\u00f3mo ha evolucionado la convenci\u00f3n y por qu\u00e9 se realizaron cambios espec\u00edficos. Esto refuerza la transparencia y la responsabilidad.<\/p>\n\n\n\n<p>Al establecer un proceso de gesti\u00f3n de modificaciones bien definido y documentar todas las revisiones, la Convenci\u00f3n BIM se mantiene actualizada, coherente y alineada con las necesidades del proyecto. Esto ayuda a evitar malentendidos, errores y conflictos relacionados con las modificaciones de la convenci\u00f3n, al tiempo que preserva el rastro de la evoluci\u00f3n de las decisiones tomadas a lo largo del tiempo.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Formaci\u00f3n y Sensibilizaci\u00f3n<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Formaci\u00f3n BIM<\/h3>\n\n\n\n<p>La <strong>formaci\u00f3n<\/strong> es esencial para asegurarse de que todas las partes interesadas comprendan la Convenci\u00f3n BIM y c\u00f3mo debe ser implementada. Esto garantiza que todos est\u00e9n familiarizados con los procedimientos, est\u00e1ndares, protocolos, derechos y responsabilidades definidas en la convenci\u00f3n.<\/p>\n\n\n\n<p>Para lograr esto, se pueden considerar diferentes m\u00e9todos seg\u00fan las necesidades del proyecto y las preferencias de las partes interesadas. Esto puede incluir sesiones de formaci\u00f3n en l\u00ednea, talleres pr\u00e1cticos, formaci\u00f3n presencial o materiales de formaci\u00f3n escritos. En su <a href=\"https:\/\/article-formations.batiactu.com\/conseil\/comment-se-former-au-bim-51085.php\"><strong>art\u00edculo<\/strong><\/a>, <a href=\"https:\/\/article-formations.batiactu.com\/conseil\/comment-se-former-au-bim-51085.php\"><strong>Batiactu<\/strong><\/a> presenta algunas soluciones clave para formarse en BIM.<\/p>\n\n\n\n<p>Es importante personalizar la formaci\u00f3n seg\u00fan los roles y necesidades espec\u00edficas de cada parte interesada. Los arquitectos, ingenieros, contratistas, propietarios y otros actores pueden tener requisitos de formaci\u00f3n diferentes.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Sensibilizaci\u00f3n a la Convenci\u00f3n BIM<\/h3>\n\n\n\n<p>Es crucial <strong>sensibilizar a todas las partes interesadas<\/strong> sobre la importancia de la Convenci\u00f3n BIM y su implementaci\u00f3n. Las estrategias de sensibilizaci\u00f3n pueden incluir reuniones informativas, comunicaci\u00f3n regular, estudios de casos y testimonios.<\/p>\n\n\n\n<p>Es importante <strong>involucrar activamente a cada persona<\/strong> en el proceso de sensibilizaci\u00f3n. Esto puede incluir sesiones de preguntas y respuestas, grupos de trabajo para discutir la convenci\u00f3n y retroalimentaci\u00f3n para mejorar su implementaci\u00f3n.<\/p>\n\n\n\n<p>La sensibilizaci\u00f3n no deber\u00eda ser un evento \u00fanico. De hecho, debe ser continua a lo largo del proyecto para asegurar que todas las partes interesadas sigan comprometidas y comprendan la importancia de la convenci\u00f3n. Esto contribuye a garantizar que la convenci\u00f3n se utilice correctamente y que se aprovechen plenamente los beneficios del BIM a lo largo del proyecto.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Conclusi\u00f3n<\/h2>\n\n\n\n<p>Para concluir sobre el desarrollo de una Convenci\u00f3n BIM eficaz, podemos afirmar que se basa en cuatro pilares esenciales: la informaci\u00f3n requerida, la gesti\u00f3n de los derechos, la gesti\u00f3n de las modificaciones y la formaci\u00f3n\/sensibilizaci\u00f3n.<\/p>\n\n\n\n<p>Juntos, estos elementos hacen de la Convenci\u00f3n BIM una herramienta poderosa para la gesti\u00f3n de la informaci\u00f3n, la protecci\u00f3n de los derechos y la colaboraci\u00f3n exitosa a lo largo del proyecto.<\/p>\n\n\n\n<p>\u00a1Si tienes preguntas sobre la Convenci\u00f3n BIM, ponte en contacto con uno de nuestros expertos en <a href=\"https:\/\/www.bimandco.com\/bim\/es\/?utm_source=bimandco&amp;utm_medium=blog&amp;utm_campaign=blog-convention-bim-2-012024&amp;utm_content=ES\"><strong>BIM&amp;CO<\/strong><\/a>!<\/p>\n\n\n\n<p><a class=\"btn btn-blue-medium\" href=\"https:\/\/meetings.hubspot.com\/miguel-munoz-garcia?utm_source=bimandco&amp;utm_medium=blog&amp;utm_campaign=blog-convention-bim-2-012024&amp;utm_content=ES\" target=\"_blank\" rel=\"noreferrer noopener\">Agenda una cita<\/a><\/p><br>\n","protected":false},"excerpt":{"rendered":"<p>En nuestro art\u00edculo anterior, sentamos las bases para la Convenci\u00f3n BIM. Ahora vamos a sumergirnos aun m\u00e1s en el desarrollo [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":40111,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","footnotes":""},"categories":[782],"tags":[1485,1920,2748,2436,2774],"class_list":["post-40135","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-bim","tag-bimco","tag-convention-bim","tag-data","tag-innovation"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Desarrollar una Convenci\u00f3n BIM Completa y Eficaz<\/title>\n<meta name=\"description\" content=\"Convenci\u00f3n BIM: Sum\u00e9rjase en cuatro pilares cruciales: los datos requeridos, la gesti\u00f3n de derechos, los procesos de modificaci\u00f3n y la formaci\u00f3n.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.bimandco.com\/bim\/es\/desarrollar-una-convencion-bim-completa-y-eficaz\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Desarrollar una Convenci\u00f3n BIM Completa y Eficaz\" \/>\n<meta property=\"og:description\" content=\"Convenci\u00f3n BIM: Sum\u00e9rjase en cuatro pilares cruciales: los datos requeridos, la gesti\u00f3n de derechos, los procesos de modificaci\u00f3n y la formaci\u00f3n.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.bimandco.com\/bim\/es\/desarrollar-una-convencion-bim-completa-y-eficaz\/\" \/>\n<meta property=\"og:site_name\" content=\"BIM&amp;CO\" \/>\n<meta property=\"article:published_time\" content=\"2024-01-15T08:00:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.bimandco.com\/bim\/wp-content\/uploads\/2024\/01\/Capture-d\u2019e\u0301cran-2024-01-09-a\u0300-15.12.25.png\" \/>\n\t<meta property=\"og:image:width\" content=\"2570\" \/>\n\t<meta property=\"og:image:height\" content=\"1110\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"BIM&amp;CO News\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"BIM&amp;CO News\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.bimandco.com\/bim\/es\/desarrollar-una-convencion-bim-completa-y-eficaz\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.bimandco.com\/bim\/es\/desarrollar-una-convencion-bim-completa-y-eficaz\/\"},\"author\":{\"name\":\"BIM&amp;CO News\",\"@id\":\"https:\/\/www.bimandco.com\/bim\/#\/schema\/person\/edb28b34df7007af716327e61181e31e\"},\"headline\":\"Desarrollar una Convenci\u00f3n BIM Completa y Eficaz\",\"datePublished\":\"2024-01-15T08:00:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.bimandco.com\/bim\/es\/desarrollar-una-convencion-bim-completa-y-eficaz\/\"},\"wordCount\":1679,\"publisher\":{\"@id\":\"https:\/\/www.bimandco.com\/bim\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.bimandco.com\/bim\/es\/desarrollar-una-convencion-bim-completa-y-eficaz\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.bimandco.com\/bim\/wp-content\/uploads\/2024\/01\/Capture-d\u2019e\u0301cran-2024-01-09-a\u0300-15.12.25.png\",\"keywords\":[\"BIM\",\"BIM&amp;CO\",\"Convention BIM\",\"data\",\"Innovation\"],\"articleSection\":[\"Blog\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.bimandco.com\/bim\/es\/desarrollar-una-convencion-bim-completa-y-eficaz\/\",\"url\":\"https:\/\/www.bimandco.com\/bim\/es\/desarrollar-una-convencion-bim-completa-y-eficaz\/\",\"name\":\"Desarrollar una Convenci\u00f3n BIM Completa y Eficaz\",\"isPartOf\":{\"@id\":\"https:\/\/www.bimandco.com\/bim\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.bimandco.com\/bim\/es\/desarrollar-una-convencion-bim-completa-y-eficaz\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.bimandco.com\/bim\/es\/desarrollar-una-convencion-bim-completa-y-eficaz\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.bimandco.com\/bim\/wp-content\/uploads\/2024\/01\/Capture-d\u2019e\u0301cran-2024-01-09-a\u0300-15.12.25.png\",\"datePublished\":\"2024-01-15T08:00:00+00:00\",\"description\":\"Convenci\u00f3n BIM: Sum\u00e9rjase en cuatro pilares cruciales: los datos requeridos, la gesti\u00f3n de derechos, los procesos de modificaci\u00f3n y la formaci\u00f3n.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.bimandco.com\/bim\/es\/desarrollar-una-convencion-bim-completa-y-eficaz\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.bimandco.com\/bim\/es\/desarrollar-una-convencion-bim-completa-y-eficaz\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.bimandco.com\/bim\/es\/desarrollar-una-convencion-bim-completa-y-eficaz\/#primaryimage\",\"url\":\"https:\/\/www.bimandco.com\/bim\/wp-content\/uploads\/2024\/01\/Capture-d\u2019e\u0301cran-2024-01-09-a\u0300-15.12.25.png\",\"contentUrl\":\"https:\/\/www.bimandco.com\/bim\/wp-content\/uploads\/2024\/01\/Capture-d\u2019e\u0301cran-2024-01-09-a\u0300-15.12.25.png\",\"width\":2570,\"height\":1110},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.bimandco.com\/bim\/es\/desarrollar-una-convencion-bim-completa-y-eficaz\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\/\/www.bimandco.com\/bim\/fr\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Desarrollar una Convenci\u00f3n BIM Completa y Eficaz\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.bimandco.com\/bim\/#website\",\"url\":\"https:\/\/www.bimandco.com\/bim\/\",\"name\":\"BIM&amp;CO\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/www.bimandco.com\/bim\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.bimandco.com\/bim\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.bimandco.com\/bim\/#organization\",\"name\":\"BIM&amp;CO\",\"url\":\"https:\/\/www.bimandco.com\/bim\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.bimandco.com\/bim\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.bimandco.com\/bim\/wp-content\/uploads\/2023\/03\/logo-bimandco-1.svg\",\"contentUrl\":\"https:\/\/www.bimandco.com\/bim\/wp-content\/uploads\/2023\/03\/logo-bimandco-1.svg\",\"width\":102,\"height\":50,\"caption\":\"BIM&amp;CO\"},\"image\":{\"@id\":\"https:\/\/www.bimandco.com\/bim\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.bimandco.com\/bim\/#\/schema\/person\/edb28b34df7007af716327e61181e31e\",\"name\":\"BIM&amp;CO News\",\"url\":\"https:\/\/www.bimandco.com\/bim\/author\/admin_bim\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Desarrollar una Convenci\u00f3n BIM Completa y Eficaz","description":"Convenci\u00f3n BIM: Sum\u00e9rjase en cuatro pilares cruciales: los datos requeridos, la gesti\u00f3n de derechos, los procesos de modificaci\u00f3n y la formaci\u00f3n.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.bimandco.com\/bim\/es\/desarrollar-una-convencion-bim-completa-y-eficaz\/","og_locale":"fr_FR","og_type":"article","og_title":"Desarrollar una Convenci\u00f3n BIM Completa y Eficaz","og_description":"Convenci\u00f3n BIM: Sum\u00e9rjase en cuatro pilares cruciales: los datos requeridos, la gesti\u00f3n de derechos, los procesos de modificaci\u00f3n y la formaci\u00f3n.","og_url":"https:\/\/www.bimandco.com\/bim\/es\/desarrollar-una-convencion-bim-completa-y-eficaz\/","og_site_name":"BIM&amp;CO","article_published_time":"2024-01-15T08:00:00+00:00","og_image":[{"width":2570,"height":1110,"url":"https:\/\/www.bimandco.com\/bim\/wp-content\/uploads\/2024\/01\/Capture-d\u2019e\u0301cran-2024-01-09-a\u0300-15.12.25.png","type":"image\/png"}],"author":"BIM&amp;CO News","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"BIM&amp;CO News","Dur\u00e9e de lecture estim\u00e9e":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.bimandco.com\/bim\/es\/desarrollar-una-convencion-bim-completa-y-eficaz\/#article","isPartOf":{"@id":"https:\/\/www.bimandco.com\/bim\/es\/desarrollar-una-convencion-bim-completa-y-eficaz\/"},"author":{"name":"BIM&amp;CO News","@id":"https:\/\/www.bimandco.com\/bim\/#\/schema\/person\/edb28b34df7007af716327e61181e31e"},"headline":"Desarrollar una Convenci\u00f3n BIM Completa y Eficaz","datePublished":"2024-01-15T08:00:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.bimandco.com\/bim\/es\/desarrollar-una-convencion-bim-completa-y-eficaz\/"},"wordCount":1679,"publisher":{"@id":"https:\/\/www.bimandco.com\/bim\/#organization"},"image":{"@id":"https:\/\/www.bimandco.com\/bim\/es\/desarrollar-una-convencion-bim-completa-y-eficaz\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bimandco.com\/bim\/wp-content\/uploads\/2024\/01\/Capture-d\u2019e\u0301cran-2024-01-09-a\u0300-15.12.25.png","keywords":["BIM","BIM&amp;CO","Convention BIM","data","Innovation"],"articleSection":["Blog"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/www.bimandco.com\/bim\/es\/desarrollar-una-convencion-bim-completa-y-eficaz\/","url":"https:\/\/www.bimandco.com\/bim\/es\/desarrollar-una-convencion-bim-completa-y-eficaz\/","name":"Desarrollar una Convenci\u00f3n BIM Completa y Eficaz","isPartOf":{"@id":"https:\/\/www.bimandco.com\/bim\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.bimandco.com\/bim\/es\/desarrollar-una-convencion-bim-completa-y-eficaz\/#primaryimage"},"image":{"@id":"https:\/\/www.bimandco.com\/bim\/es\/desarrollar-una-convencion-bim-completa-y-eficaz\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bimandco.com\/bim\/wp-content\/uploads\/2024\/01\/Capture-d\u2019e\u0301cran-2024-01-09-a\u0300-15.12.25.png","datePublished":"2024-01-15T08:00:00+00:00","description":"Convenci\u00f3n BIM: Sum\u00e9rjase en cuatro pilares cruciales: los datos requeridos, la gesti\u00f3n de derechos, los procesos de modificaci\u00f3n y la formaci\u00f3n.","breadcrumb":{"@id":"https:\/\/www.bimandco.com\/bim\/es\/desarrollar-una-convencion-bim-completa-y-eficaz\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.bimandco.com\/bim\/es\/desarrollar-una-convencion-bim-completa-y-eficaz\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.bimandco.com\/bim\/es\/desarrollar-una-convencion-bim-completa-y-eficaz\/#primaryimage","url":"https:\/\/www.bimandco.com\/bim\/wp-content\/uploads\/2024\/01\/Capture-d\u2019e\u0301cran-2024-01-09-a\u0300-15.12.25.png","contentUrl":"https:\/\/www.bimandco.com\/bim\/wp-content\/uploads\/2024\/01\/Capture-d\u2019e\u0301cran-2024-01-09-a\u0300-15.12.25.png","width":2570,"height":1110},{"@type":"BreadcrumbList","@id":"https:\/\/www.bimandco.com\/bim\/es\/desarrollar-una-convencion-bim-completa-y-eficaz\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/www.bimandco.com\/bim\/fr\/"},{"@type":"ListItem","position":2,"name":"Desarrollar una Convenci\u00f3n BIM Completa y Eficaz"}]},{"@type":"WebSite","@id":"https:\/\/www.bimandco.com\/bim\/#website","url":"https:\/\/www.bimandco.com\/bim\/","name":"BIM&amp;CO","description":"","publisher":{"@id":"https:\/\/www.bimandco.com\/bim\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.bimandco.com\/bim\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.bimandco.com\/bim\/#organization","name":"BIM&amp;CO","url":"https:\/\/www.bimandco.com\/bim\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.bimandco.com\/bim\/#\/schema\/logo\/image\/","url":"https:\/\/www.bimandco.com\/bim\/wp-content\/uploads\/2023\/03\/logo-bimandco-1.svg","contentUrl":"https:\/\/www.bimandco.com\/bim\/wp-content\/uploads\/2023\/03\/logo-bimandco-1.svg","width":102,"height":50,"caption":"BIM&amp;CO"},"image":{"@id":"https:\/\/www.bimandco.com\/bim\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.bimandco.com\/bim\/#\/schema\/person\/edb28b34df7007af716327e61181e31e","name":"BIM&amp;CO News","url":"https:\/\/www.bimandco.com\/bim\/author\/admin_bim\/"}]}},"_links":{"self":[{"href":"https:\/\/www.bimandco.com\/bim\/wp-json\/wp\/v2\/posts\/40135","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bimandco.com\/bim\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bimandco.com\/bim\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bimandco.com\/bim\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bimandco.com\/bim\/wp-json\/wp\/v2\/comments?post=40135"}],"version-history":[{"count":5,"href":"https:\/\/www.bimandco.com\/bim\/wp-json\/wp\/v2\/posts\/40135\/revisions"}],"predecessor-version":[{"id":40148,"href":"https:\/\/www.bimandco.com\/bim\/wp-json\/wp\/v2\/posts\/40135\/revisions\/40148"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bimandco.com\/bim\/wp-json\/wp\/v2\/media\/40111"}],"wp:attachment":[{"href":"https:\/\/www.bimandco.com\/bim\/wp-json\/wp\/v2\/media?parent=40135"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bimandco.com\/bim\/wp-json\/wp\/v2\/categories?post=40135"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bimandco.com\/bim\/wp-json\/wp\/v2\/tags?post=40135"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}